  • Derinsu has committed to cover all Offshore Surveys  for Akkuyu NPP Project, Marine Hydrological and Ecological Works.
  • Derinsu has completed Offshore High Resolution Seismic Survey for Akkuyu NPP Project.
  • Derinsu has completed Offshore Survey for Determination of Iskenderun Bay Dredged Material Dumping Area Selection. Hydrographic, Oceanograhic, Ecological and Environmental Surveys have completed.
  • Derinsu has committed to observe continious Physical Oceanographic Parameter at Erzin Power Plant Project for GAMA. Seaguard Doppler Current Measurement System has deployed onsite for long term monitoring.
  • Derinsu has completed Canakkale Shipwrecks High Resolution MultiBeam Survey. More then 30 wrecks has surveyed and 3D images has reported.
  • Derinsu has completed Integrated Marine Pollution Monitoring Project for Aegean Sea and Medditerranean Sea
  • Derinsu has completed Marine Surveys for CENAL Karabiga Power Plant Project. Conseptual Engineering Design for Port and Intake/Discharge Pipeline Projects completed. Thermal Dilution Modeling and Wave Distrubution Modeling have succesfully reported by using DHI MIKE3 and MIKE21 BW.
  • Derinsu submitted the Final Report of Lapseki – Sütlüce 380 kV, 1600 mm2 / Phase, Double Circuit Submarine Cable Crossing of Dardanelles Strait Submarine Route Survey and Engineering Design Consulting Service Procurement Project.
  • Derinsu completed the Marine Surveys of KKTC Kalecik Power Plant Intake Structure, Underwater Pipeline and Pump House. Engineering Design Report was also submitted.
  • Derinsu completed Hatay İskenderun Port Assessment and Port Capacity Increasing Project – Hydrographic, Oceanographic, Geological and Geophysical Survey Reports.
  • Derinsu completed Hatay İskenderun Port Assessment and Port Capacity Increasing Project – Marine Environmental Survey Report.
  • Derinsu has signed a contract to provide Engineering & Consultancy Services for Hatay İskenderun Port.